SEANM August 2021 Monthly Meeting

August 18, 2021
8:00 AM MDT - 9:00 AM MDT

 Add to Calendar

Live Webinar - Meeting link will be sent via email the day before the meeting.


 Directions

PRESENTATION:

Short Span Steel Bridge Alliance

 

PRESENTED BY:

Michael Barker, PE, PhD
Director - SSSBA Bridge Education Center

Professor - Civil & Architectural Engineering, University of Wyoming

 

DESCRIPTION:

Short span steel bridges meet owners’ and the public’s desire for economy, aesthetics, performance and accelerated construction.  Steel bridges can be fabricated off-site in a controlled environment and ready to erect as soon as it reaches the bridge site.  They are lighter weight, resulting in lighter equipment needs and fewer cranes, and they can be built with local work crews.  Prefabricated bridges accelerate construction and reduce on-site labor requirements, reduce traffic disruption, and lower overall project costs.  Bridge manufacturers and fabricators have developed innovative, efficient and economical solutions to meet bridge project needs.  Several bridge projects from manufacturers and pre-fabricated built bridges will be showcased to demonstrate their merits in bridge quality and accelerated construction.

 

Short Span Steel Bridge Alliance | Industry Resources, News & Education (shortspansteelbridges.org)

LOCATION:

Zoom meeting information will be sent the day of the meeting.

SLIDES AND VIDEO:

https://www.shortspansteelbridges.org/seanm-webinar/

Tickets

$20.00 Non-Member Meeting Fee

$0.00 Member Meeting Fee